Transmission Line Flushing Activities 1/11/2019 and 1/12/2019

The CONSTRUCTION AND MAINTENANCE DIVISION will conduct TRANSMISSION LINE FLUSHING ACTIVITIES  from BUBOG PUMPING STATION TO TIGAYON PUMPING STATION on JANUARY 11, 2019 and from LIBTONG PUMPING STATION TO TINIGAO PUMPING STATION on JANUARY 12, 2019 starting from 9:00 PM.

Concessionaires in the GREATER KALIBO AREA may experience low water pressure to no water supply during the activity.

Adjoining areas may also experience low water pressure and turbid water due to turbulence of water flow that may occur during the flushing activity.

Normal water supply will resume upon completion of said activity.

For inquiries and other concerns, please call our hotlines at 145 (PANTELCO) and 1620 (CRUZTELCO).

Posted in Service Advisory
0 comments on “Transmission Line Flushing Activities 1/11/2019 and 1/12/2019
1 Pings/Trackbacks for "Transmission Line Flushing Activities 1/11/2019 and 1/12/2019"
  1. Awesome website

    […]the time to read or visit the content or sites we have linked to below the[…]…

Leave a Reply

   

transparency sealISO
foilogo

Like us on Facebook